Gallery » Contract Work » Tender » Tender Body August 2011
 
S1050734
Image 1 of 8
The driver's side of the tender with the coal space starting to take shape.
Photo: Pam Smith
S1050735
Image 2 of 8
A view looking down onto the driver's side of the tender showing the coal space starting to take shape.
Photo: Pam Smith
S1050736
Image 3 of 8
A view looking down onto the driver's side of the tender showing the front of the coal space.
Photo: Pam Smith
S1050737
Image 4 of 8
An inside view indicating there's still much to do at the front and for the bunker.
Photo: Pam Smith
P8050351
Image 5 of 8
The rear of the tender seen on the 5th August 2011.
Photo: Peter Randall
P8050352
Image 6 of 8
A good view of the upper side showing the water space complete as 5th August 2011.
Photo: Peter Randall
P8050353
Image 7 of 8
A top view showing that the coal space is almost complete.
Photo: Peter Randall
S1050741
Image 8 of 8
By the 23rd August the front lockers and bunker doors were in the process of being fitted.
Photo: Pam Smith
Generated by jAlbum 12.1.8, Matrix 15.0
empty