NG15 No134 Restoration » 'Contract' Work » Rear Loco Dragbox  (11 Slides)     [Page 2 of 2] :: Jump To  
  First page Previous page      Up one level      You have reached the last page You have reached the last page  

Details of restoration and contract refurbishment work outside of the working parties

The dragbox was still being worked on in June 2013. Here the internal mechanism for the rocking grate can be seen.  Photo: Andie Shaw
On the last few days of July 2013 the dragbox side faces were being accurately machined to go between the frames.  Photo: Jon Whalley
The dragbox side faces after being accurately machined to go between the frames.  Photo: Jon Whalley
   
   
   
Construction of the new rear dragbox
Album last updated on 2013-10-03
Powered by jAlbum 9 and BluPlusPlus skin
Photographs © as indicated.