Gallery » Working Parties » 2014 Working Parties » WWEJune(2)14
20140627 163306
Image 1 of 8
Driving wheel axlebox being built up with weld prior to re-machining.
Photo: Andie Shaw
20140627 163323
Image 2 of 8
Driving wheel axlebox being built up with weld prior to re-machining.
Photo: Andie Shaw
20140628 165009
Image 3 of 8
The last axle box face being worked on to make it flat and square.
Photo: Andie Shaw
IMG 0229
Image 4 of 8
The tender bogies following the weekend's work.
Photo: Laurence Armstrong
IMG 0231
Image 5 of 8
The first set of wheels after being cleaned and painted in undercoat.
Photo: Laurence Armstrong
IMG 0228
Image 6 of 8
The second set of wheels after being cleaned.
Photo: Laurence Armstrong
134 top 140708-1
Image 7 of 8
The top of the loco frames having been cleared of stored material to allow the fitting of the remaining running plates.
Photo: Clive Bricsoe
134 top 140708-5
Image 8 of 8
The rear top area of the loco frames following the tidy-up.
Photo: Clive Bricsoe
Generated by jAlbum 12.1.8, Matrix 15.0
empty