Gallery » Working Parties » 2015 Working Parties » WWEDec15
 
IMG 0872
Image 1 of 6
The drain cock operating arm on the lay-shaft that then operates the drain cocks on both cylinders.
Photo: Laurence Armstrong
IMG 0873
Image 2 of 6
One of the drain cock operating rods on the running plate after receiving some attention. This is now considerably straighter than it was!
Photo: Laurence Armstrong
IMG 0874
Image 3 of 6
This is one of the sander operating rods and shows the typical bent condition the sander and drain cock rods were in.
Photo: Laurence Armstrong
IMG 0875
Image 4 of 6
The card templates to check the hole alignment for the drain cock valve linking plate.
Photo: Laurence Armstrong
IMG 0876
Image 5 of 6
One of the card templates in place to check fit.
Photo: Laurence Armstrong
IMG 0884
Image 6 of 6
A drain cock valve linking plate after drilling.
Photo: Laurence Armstrong
Generated by jAlbum 13.0.8, Matrix 29