Contract Work
Details of contract work done as part of the restoration including the new body needed for the tender.
Sandblasted and priming of the frames prior to painting.
(9 images)
The various wheelsets have had their journals attended to and the tyres re-profiled.
(7 images)
A brand new tender body was built by Brunswick Ironworks in Caernarfon.
(70 images)
Refurbishment of the rear frame stretcher.
(17 images)
Manufacture of a replacement rear dragbox for the loco
(16 images)
Some of the more interesting smaller items being made.
(8 images)
Acquisition and fitting of the vacuum reservoirs.
(6 images)
Overhaul and certification of the boiler.
(25 images)
Motion
(2 images)